back to NorthStar home
about NorthStar Engineering and Surveying
contact NorthStar
search our site
main_menu
Search

Email this article
 Printer friendly page

Detailed Drainage Master Plans have been prepared for the following projects (list is not all inclusive but provides a sample of project types completed):

  • 370 acre Hyde Park Drainage Study for the City of Pueblo, CO.
  • 1800 acre drainage study with multiple regional detention and conveyance facilities for the SouthPointe Development, Pueblo, CO.
  • 240 acre on-site and 89 square mile off-site drainage study for the YMCA Community Campus, Pueblo, CO.
  • 150 acre on-site and 15 square mile off site drainage study for the Southern Colorado Medical Center and Parkwest Business Campus, Pueblo, CO.
  • 990 acre drainage study with multiple regional detention facilities for the Eagleridge Development, Pueblo, CO.
  • 745 acre drainage study for the Walking Stick Development and Golf Course, Pueblo, CO.
  • 100 acre on-site and 800 acre off-site drainage study for the Meadowbrook Subdivision in Canon City, CO .
  • Extended Detention Facility Drainage Study for the Laredo at Lakeshore and Laredo at Parkside Developments, Pueblo, CO.
  • Colorado State University - Pueblo drainage study, Pueblo, CO.
  • Design of many of the drainage improvements identified in the above referenced studies have also been completed.

Specialized Drainage Improvement Design projects include but are not limited to:
  

  • Flood Plain analysis of the Arkansas River for the Pueblo Conservancy District, Pueblo, CO.
  • Analysis of capacity and detention conditions for and design of improvements to approximately two miles of the Arkansas Valley Conduit through Pueblo, CO.
  • Analysis of Cimarron River flood plain and design of new crossing for the Town of Springer, NM.